Construction Estimating & Bid Control Manual: A Contractor's Field Guide to Accurate Takeoffs, Costing, Overhead, Markup, Closing, Change Orders, and Estimate-to-Actual Job Costing

Prijzen vanaf
92,59

Uitgelicht

VERGELIJK ALLE AANBIEDERS (2)

Beschrijving

Construction Estimating & Bid Control Manual: A Contractor's Field Guide to Accurate Takeoffs, Costing, Overhead, Markup, Closing, Change Orders, and Estimate-to-Actual Job Costing

Vergelijk aanbieders (2)

Shop
Prijs
Verzendkosten
Totale prijs
92,59
Gratis
92,59
Naar shop
Gratis Shipping Costs
92,59
Gratis
92,59
Naar shop
Gratis Shipping Costs
Beschrijving (0)

Construction Estimating & Bid Control Manual: A Contractor's Field Guide to Accurate Takeoffs, Costing, Overhead, Markup, Closing, Change Orders, and Estimate-to-Actual Job Costing


Productspecificaties

Merk Independently Published
EAN
  • 9798191984438

Uitgelichte Keuze
92,59
Naar shop