Operations Management Critical Factor 2nd edition
Uitgelicht
|
60,99 |
Naar shop
|
Beschrijving
Bol
This publication will examine methods many others typically do not investigate. In addition to the standard discussions of the traditional Design-Bid-Build (DBB), Design-Build (DB), Construction Management at Risk (CMAR), and Construction Management Agency (CMA) the book will review Public Private Partnerships (P3), Competitive Sealed Proposals-Best Value(BV), Integrated Project Delivery (IPD), Multi-Prime (MP), Performance Based Proposals, Job Order Contracting (JOC), Shared Energy Savings Performance (ESCO), Indefinite Delivery/Indefinite Quantity (IDIQ), Lease-Lease Back (LLB- California) and variations such as Collaborative Design Build and others.
Vergelijk aanbieders (1)
This publication will examine methods many others typically do not investigate. In addition to the standard discussions of the traditional Design-Bid-Build (DBB), Design-Build (DB), Construction Management at Risk (CMAR), and Construction Management Agency (CMA) the book will review Public Private Partnerships (P3), Competitive Sealed Proposals-Best Value(BV), Integrated Project Delivery (IPD), Multi-Prime (MP), Performance Based Proposals, Job Order Contracting (JOC), Shared Energy Savings Performance (ESCO), Indefinite Delivery/Indefinite Quantity (IDIQ), Lease-Lease Back (LLB- California) and variations such as Collaborative Design Build and others.
Productspecificaties
| EAN |
|
|---|---|
| Maat |
|
Prijzen voor het laatst bijgewerkt op: