Rail Splitter Wind Farm

Prijzen vanaf
180,00

Uitgelicht

Beschrijving

Bol Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. The Rail Splitter Wind Farm is a 67-turbine wind farm in northern Logan County and southern Tazewell County in the U.S. state of Illinois. The turbines are expected to generate a maximum of 100.5 megawatts of electricity. The wind farm is owned and operated by Horizon Wind Energy. The wind turbines that constitute the farm are centered around the town of Emden on both sides of Interstate 155. The wind farm, constructed in 2008-2009 at a cost of $200.0 million, was dedicated on July 21, 2009.

Vergelijk aanbieders (1)

Sorteren op:

€ 180,00 Gratis verzending

Beschrijving (1)

Please note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. The Rail Splitter Wind Farm is a 67-turbine wind farm in northern Logan County and southern Tazewell County in the U.S. state of Illinois. The turbines are expected to generate a maximum of 100.5 megawatts of electricity. The wind farm is owned and operated by Horizon Wind Energy. The wind turbines that constitute the farm are centered around the town of Emden on both sides of Interstate 155. The wind farm, constructed in 2008-2009 at a cost of $200.0 million, was dedicated on July 21, 2009.


Productspecificaties

EAN
  • 9783639968125
Maat


Prijshistorie

Prijzen voor het laatst bijgewerkt op:

Uitgelichte Keuze
180,00
Naar shop