THE VARIATION ORDER: A CONSTRUCTION INDUSTRY THRILLER (The Critical Path Series, Book 2)

Prijzen vanaf
15,00

Gesponsorde links

VERGELIJK ALLE AANBIEDERS (3)

Beschrijving

Bol 118 Days to the Summit. One glass tower rising for the world to see. And a paper trail that leads straight to a catastrophe. In the high-stakes world of international construction, the Aurelia Exchange is more than just a skyscraper; it's a promise made to people who can't be told no. For Ethan Cole, a senior site engineer haunted by a hospital project that killed a man to open early, Aurelia was supposed to be a fresh start-a chance to build something that isn't a lie. But on his first morning, Ethan finds a manila folder in his desk that shouldn't be there. It's a Variation Register containing a secret history of every change, every cost, and every shortcut taken on his past disaster. Tucked at the bottom is a warning: CODE VA-0447 NOW LIVE AT AURELIA. WATCH WHERE IT LANDS BEFORE YOU KNOW WHY IT'S THERE. The Ladder is moving. As the "Summit" deadline looms, Ethan is pulled into a "pressure system" where the appearance of safety is cheaper to produce than safety itself. Alongside Maya Lim, a relentless commercial auditor following a global trail of shell companies and rigged tenders, Ethan discovers "The Ladder"-a systemic mechanism of corruption that engineers variations into a building's bones before the first shovel even hits the ground. From the executive "Club Floors" where millions are moved without a single signature to the dark cavities of the tower core where fire barriers are missing, Ethan must navigate a world where truth is just another resource to be priced. When a sudden storm exposes the tower's lethal defects in front of forty world-class investors, the countdown to the Summit becomes a race for survival. Ethan is forced to choose: - Demand a total shutdown that will trigger insolvency, killing two thousand jobs and ending his career.- Or use his evidence as leverage to force a "negotiated truth"-becoming the very thing he spent months trying to expose. The Variation Order is a gritty, authentic technical thriller that pulls back the curtain on the multi-billion-dollar construction industry. It explores the terrifying moment when a paper record diverges from physical reality, and the man who has to decide what that silence is worth. "A price agreed twice is not the same price. The second time, someone else decided what you would accept." What readers are saying about The Critical Path Series: "Ethan Cole is the thinking man's hero-smart, flawed, and trapped in a system built to break him." "Technical accuracy meets cinematic tension. I'll never look at a high-rise the same way again. " The Critical Path Series: Book One: Zero Float Book Two: The Variation Order Book Three: Ground Conditions

Vergelijk aanbieders (3)

Gesponsorde links · Sommige shops betalen ons een vergoeding

Sorteren op:

€ 15,00 € 2,99 verzendkosten Totaal € 17,99

€ 15,73 Gratis verzending

€ 15,73 Gratis verzending

Beschrijving (1)

118 Days to the Summit. One glass tower rising for the world to see. And a paper trail that leads straight to a catastrophe. In the high-stakes world of international construction, the Aurelia Exchange is more than just a skyscraper; it's a promise made to people who can't be told no. For Ethan Cole, a senior site engineer haunted by a hospital project that killed a man to open early, Aurelia was supposed to be a fresh start-a chance to build something that isn't a lie. But on his first morning, Ethan finds a manila folder in his desk that shouldn't be there. It's a Variation Register containing a secret history of every change, every cost, and every shortcut taken on his past disaster. Tucked at the bottom is a warning: CODE VA-0447 NOW LIVE AT AURELIA. WATCH WHERE IT LANDS BEFORE YOU KNOW WHY IT'S THERE. The Ladder is moving. As the "Summit" deadline looms, Ethan is pulled into a "pressure system" where the appearance of safety is cheaper to produce than safety itself. Alongside Maya Lim, a relentless commercial auditor following a global trail of shell companies and rigged tenders, Ethan discovers "The Ladder"-a systemic mechanism of corruption that engineers variations into a building's bones before the first shovel even hits the ground. From the executive "Club Floors" where millions are moved without a single signature to the dark cavities of the tower core where fire barriers are missing, Ethan must navigate a world where truth is just another resource to be priced. When a sudden storm exposes the tower's lethal defects in front of forty world-class investors, the countdown to the Summit becomes a race for survival. Ethan is forced to choose: - Demand a total shutdown that will trigger insolvency, killing two thousand jobs and ending his career.- Or use his evidence as leverage to force a "negotiated truth"-becoming the very thing he spent months trying to expose. The Variation Order is a gritty, authentic technical thriller that pulls back the curtain on the multi-billion-dollar construction industry. It explores the terrifying moment when a paper record diverges from physical reality, and the man who has to decide what that silence is worth. "A price agreed twice is not the same price. The second time, someone else decided what you would accept." What readers are saying about The Critical Path Series: "Ethan Cole is the thinking man's hero-smart, flawed, and trapped in a system built to break him." "Technical accuracy meets cinematic tension. I'll never look at a high-rise the same way again. " The Critical Path Series: Book One: Zero Float Book Two: The Variation Order Book Three: Ground Conditions


Productspecificaties

Merk Independently Published
EAN
  • 9798191404349
Maat


Prijshistorie

* Prijshistorie bevat geen data van Amazon, Amazon Marketplace.

Prijzen voor het laatst bijgewerkt op:

Uitgelichte Keuze
15,00
Naar shop